{"ocid":"ocds-mv5oob-120776-0-2026-2027-NC-01-S001","compiledRelease":{"ocid":"ocds-mv5oob-120776-0-2026-2027-NC-01-S001","buyer":{"id":"11c2418f-6a3b-40ff-be01-9d915a4ff322","name":"MIGOLI HEALTH CENTER"},"date":"2026-11-16T16:47:44Z","tag":["compiled"],"initiationType":"tender","language":"en","tender":{"id":"120776-0/2026/2027/NC/01-S001","description":"Water well drilling services","status":"complete","procurementMethod":"limited","procurementMethodDetails":"National Shopping -Lower Level (Mini Competition Quotation)","numberOfTenderers":0,"tenderPeriod":{"startDate":"2026-11-03T00:00:00Z","endDate":"2026-11-06T10:00:00Z","maxExtentDate":"2026-11-06T10:00:00Z","durationInDays":0},"bidOpening":{"date":"2026-11-06T10:42:56Z"},"additionalProcurementCategories":["services"],"procuringEntity":{"id":"11c2418f-6a3b-40ff-be01-9d915a4ff322","name":"MIGOLI HEALTH CENTER"},"items":[{"id":"aa8c377d-13cc-48b1-bda3-c7196c863f48","description":"confucting hydro geologycal survey to determine the best point to drill bore holewich will give best yeild and provide report","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Person"}},{"id":"cb80e834-8274-4feb-9010-70e8fe8c2e32","description":"mobilization and demobilization of rig and crew","classification":{"scheme":"UNSPSC","id":"72152801","description":"Domestic water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"96752f18-dab5-41e5-8fc0-f875c332ccc3","description":"site clearance and setting up","classification":{"scheme":"UNSPSC","id":"72152801","description":"Domestic water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"2e0d76dd-7d80-42fe-a80e-c4c59ea9e3ca","description":"drilling 6\"(DN150)borehole using a combination of DTH, rotary, and mud circulation methods (total depth depends on survey report)","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"d9df3101-a5c3-409d-9b6d-2e946e7890fe","description":"sampling and storing of representatives cutting at 2m intervals quantity for each borehole","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"ls"}},{"id":"61c9b7ee-72b7-4bfa-96cd-cab031c5bbfd","description":"supply and installation of uPVC plain casing 5\",3m length each and capping","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"c29cc3d4-5bdc-42e2-a646-f3daf0d4adfd","description":"supply and installation of uPVC screen cassing 5(DN 150) 3m length each","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"6adc6d48-44f9-4a24-a2ed-482c78c458a0","description":"supply and installation of borehole capping","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"47e94f38-01a4-4ff7-a672-e3ff81bc6722","description":"supply and installation of filters graval packs(quitz 2-4mm diameter","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"0e0d26e3-268f-449a-acfa-84f38c9c85ea","description":"supply and installation of inert backfill and grouting","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}},{"id":"e1738cfa-5e23-4985-81ae-b3da1dee92bf","description":"bore hole development and cleaning using air lift for 3 hrs, and restoration of drilling sites for environment protections","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":3.00,"unit":{"name":"Hour"}},{"id":"096817f2-64c2-49a1-b1e4-4ce39787262f","description":"restoration of drilling sites for environment protections","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"PS"}},{"id":"484e0bc1-3bb0-49ed-b993-40d006a3ca4f","description":"PUMP TESTING, 24hrs pumping test in 2-3 steps as follow, Step drowdown pump test 3 steps each 1hr, 2.Constant discharge pumping testfor 20hr, 3. recovery test for 1hr","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":24.00,"unit":{"name":"Hour"}},{"id":"62983cca-7dbd-40de-b1ab-00bcba0e9b5c","description":"WATER QUALITY ANALYSIS 1.water sampling and quality analysis for both physical, chemical and biological parameters 2. report preparation (borehole completion, pumping test, water quality and works)","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":2.00,"unit":{"name":"Document"}},{"id":"fe5ccbb9-035e-428a-a6cd-40a112826f07","description":"PUMP INSTRUCTION AND CONSTRUCTION WORKERS 1. Solar pump DS5-25 3HP pump C/W motor AC/DC(3000000).  2. Sunveter solar module controller and change over switch solar to tanesco power(2500000).  3. 340W crystaline solar module 9pcs (4050000). 4.Aqualflat 2.5mm core blue flat drop cable(1300000). 5.londex dual core sensor cable(1100000).  6.Cable joint (1.5-4)mm ST6(100000). 7.Armoured cable 6mm 4core (1500000).  8.Cover plate ring(90000). 9. Plastick tank 5000L 2 pcs(2400000).  10. Instalation coast 1500000; 11. construction of solar structure,tank raiser (pump house with top slap)of 3m height sorounded with wall fance 4*84*2m height with grilled gate 1*5 square pipe 1500*2000mm height (8000000), 12.Construction of well chamber and installation of protective steel cover on top of well (200000) 13.Plumbing works, material (supply and fix water network to all building ata hearth Center from water source 1500000)","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":22.00,"unit":{"name":"Pcs"}},{"id":"2a33d519-2e16-4dfe-a673-df873ba69c4e","description":"casting ofconcrete sanitary seal around the borehole","classification":{"scheme":"UNSPSC","id":"72152802","description":"Geothermal water well drilling service"},"quantity":1.00,"unit":{"name":"Ls"}}]},"awards":[{"id":"360d3b0d-335b-4fb3-a47b-8b7818414774","description":"Water well drilling services","date":"2026-11-16T00:00:00Z","value":{"currency":"TZS","amount":67505000.00},"suppliers":[{"id":"44015840-f1ad-433d-8115-a77160b27694","name":"RF-HYDROBUILDERS"}]}],"parties":[{"id":"11c2418f-6a3b-40ff-be01-9d915a4ff322","name":"MIGOLI HEALTH CENTER","address":{"region":"IRINGA","countryName":"TZ"},"identifier":{"id":"11c2418f-6a3b-40ff-be01-9d915a4ff322","scheme":"NeST","legalName":"MIGOLI HEALTH CENTER"},"additionalIdentifiers":[{"id":"120776-0","scheme":"POLALG","legalName":"MIGOLI HEALTH CENTER"}],"roles":["procuringEntity"]}],"relatedProcesses":[{"id":"ca4b6b42-af1c-4e3d-b068-1c01defdddaa","relationship":["planning"],"title":"Water well drilling services","scheme":"ocid","identifier":"ocds-mv5oob-ca4b6b42-af1c-4e3d-b068-1c01defdddaa"}],"bids":{"details":[{"id":"af6257a3-ee97-4fd1-b9c9-f7325cbee152","tenderers":[{"id":"44015840-f1ad-433d-8115-a77160b27694","name":"RF-HYDROBUILDERS"}],"value":{"currency":"TZS","amount":67505000},"countriesOfOrigin":["TZ"]}]},"id":"compiled-ocds-mv5oob-120776-0-2026-2027-NC-01-S001"},"releases":[{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/68c86555-82c4-4d3a-af94-054d34bc2ce8","date":"2026-11-03T00:00:00Z","tag":["tender"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/19c23f10-18aa-4d51-b22f-b1df2494892e","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/07af8fcb-01e8-425e-bbba-b42e55918e7b","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/434a5718-2f19-4604-a84d-769f72e4d497","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/a5c54c21-2a8c-46f4-a018-34a6a5518130","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/e396f8e6-df75-4998-a6f3-cbb89c51e59e","date":"2026-11-16T16:47:44Z","tag":["award"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/90883d84-9861-4489-9e0a-6c395eab9259","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]},{"url":"https://nest.go.tz/gateway/nest-data-portal-api/api/releases/ocds-mv5oob-120776-0-2026-2027-NC-01-S001/fbb9f2bb-3b28-49ec-b73e-d56d5cd4473e","date":"2026-11-03T00:00:00Z","tag":["tenderUpdate"]}]}